top of page

linkforce
Aug 26, 20211 min read
TLO Bin Replacement
RTIO West Angeles The Challenge Due to excessive corrosion of structural members, the upper section of the TLO Bin at West Angelas...
7420

linkforce
Aug 26, 20211 min read
Apron Feeder Change Out Project
FMG Cloudbreak Value Added Linkforce developed an innovative method for these works that reduced onsite risk, improved safety...
3830

linkforce
Aug 26, 20211 min read
Western Conveyor Crushing Facility Hopper No#8 Installation
FMG Cloudbreak Value Added The scope of this structural, mechanical and piping (SMP) / electrical and instrumentation (E&I) installation...
2330

linkforce
Aug 26, 20211 min read
CV006 Overland Conveyor
FMG Cloudbreak Value Added 1500 tonnes of steel fabrication by Linkforce for this works. Installation of idler frames to a tolerance of...
2670

linkforce
Aug 26, 20211 min read
TLO Bin Replacement Project
FMG Christmas Creek Value Added Achieving zero harm to personnel and the environment. Execution of works through the development and...
1790

linkforce
Aug 26, 20212 min read
YTK211 Tank Upgrade
RTIO Yandicoogina Value Added The conclusion of the project saw the water tank commissioned with zero injuries to personnel and zero...
860

linkforce
Aug 26, 20211 min read
Rail Welding Yard Upgrade
FMG Eliwana Value Added In addition to creating an innovative working at heights solution for this package, this project marked the first...
1820

linkforce
Aug 26, 20211 min read
Primary Crushing Building Structural Improvements
Rio Tinto Sustaining Capital Marandoo Value Added This project was successfully completed with zero injuries and zero incidents across...
1370

linkforce
Aug 26, 20212 min read
Marradong & Saddleback LTE Program
South 32 - Worsley Alumina Project Value Added Linkforce delivered a superior technical solution on this project by creating a concept...
1180

linkforce
Aug 26, 20211 min read
Wet Front End Change Out Project
FMG Cloudbreak The Challenge The scope of this project encompassed changing out the screen and chute assets in the Cloudbreak plant which...
5140

linkforce
Aug 26, 20211 min read
Trommel and Chute Replacement Project
FMG Christmas Creek The Challenge Linkforce were engaged to remove and replace the trommels and discharge chutes on OPF 1 which had...
5250

linkforce
Aug 26, 20212 min read
Car Dumper No#4 Festoon
BHP Port Hedland Client: BHP Duration: 120HR shutdown Value Added Partnering with our client from the initial scoping engagement allowing...
1050

linkforce
Aug 26, 20211 min read
JSE Wet Screen Change Out
RTIO Yandicoogina Value Added Project was executed with the utilisation of Linkforce’s ‘Project Tracker Software’ providing the client...
1240
© 2023 by Linkforce.
Privacy Statement
bottom of page